The project includes the construction of four 3-storey luxury houses on a slope.
The slope near the site was well protected during excavation. During the construction, we successfully tackled issues like limited work area and poor access conditions. As the site was far away from the driveway, heavy construction machinery was transported to the site through a 200-metre-long access road.